Work History
(Click images to enlarge)

 
Project Name
Wison Floating Systems Browse DTU

Description
Hull structural engineering and design, weight estimate, stability analysis, full 3D model, fabrication sequencing with isometrics, access study, topside/deck integration, multiple 3D presentations and  animations.
Project Name
Modular Platform Drilling Rig (MPDR)

Description
Modular Platform Drilling Rig New Design, Basis of Design development, full 3D model, 3D animations, drafting of all aspects.
Project Name
Doyon Drilling Rig 25

Description
Mechanical piping design, isometrics for all systems, structural and outfitting development, full 3D model and NavisWorks capability. Pit Complex, Pump Complex, Drilling complex.
Project Name
Parker AADU (Arctic Drilling)

Description
Transit study, Load out studies, drafting of all aspects.
Project Name
BP Liberty Extended Reach Drilling (ERD)

Description
Transit study, Load out studies, seismic studies, drafting of all aspects.
Project Name
Sunkar Drilling Barge Upgrade

Description
GE designed a steel berm sponson (SBS), tpoposed to increase the vessel water depth range instead of the more expensive rock berm. The SBS will be permanently attached to the Sunkar Rig 257 and become an integral unit.

The project included structural and marine systems upgrades.
Project Name
SBM Thunderhawk Semisubmersible Production Hull

Description
Hull design of new built FPS.


Copyright Genesis Engineering LLC 2010
2550 Gray Falls Dr Suite 300 Houston, TX 77077
Phone: 832-384-1600
Fax 832-209-7266

genesis@genesisengineers.com